Turnkey Closure Of Former Rubber And Chemical Manufacturing Facility, Painesville, Ohio

By on December 27, 2019

Regulatory Agency: Ohio Environmental Protection Agency–Division of Emergency Response and Remediation
Contaminants: VOCs, SVOCs, and Metals
Remediation: Site wide Remedial Investigation and Feasibility Study, bench scale design, In-situ Stabilization and capping of sludge materials, in-place closure of four landfill areas, and closure of chemical production areas.
Scope: Investigate, Design/Build Lump Sum Remediation to ClosureProject Summary

  • Provided a fixed price incentive-based performance contract for remediation and closure.
  • Using a Risk-Based Closure approach, ESI demonstrated the appropriateness of an in-place closure remedy for six on-site lagoons and avoid an expensive off-site disposal remedy.

Project Details

ESI completed the investigation of a 130-acre petrochemical facility including six industrial wastewater sludge lagoons, four landfill areas, a buried drum area, and a 30 acre former production area.